Sign In | Join Free | My spintoband.com |
|
Brand Name : JSHG
Model Number : HG-SP-110KV
Certification : ISO/CNAS/IAF/CA
Place of Origin : China
MOQ : One 40 HQ Container
Price : negotiation
Payment Terms : L/C, T/T or Western Union
Supply Ability : 3,000 Metric Tons per Month
Delivery Time : 2 weeks per container after PO / drawing / prepayment confirmed
Packaging Details : * Covered by Plastic Wrap or Mat or according to client's requests. * The Loading Pcs of Each Container could be calculated according to client's specification and data.
Material : Hot Roll Steel Q235, Q345, Q420, Q460, ASTM A527 A36, GR50, GR65, ST-37, ST-44, ST-52, S355JR, S355J2G3, SS41, SS50, SS55 and others equivalent steel material
Once Forming : 16m Once forming without joint
Application : Electrical Power Transformer Substation
Joint : Joint with flange mode
Shape : Conical, Round, Polygonal (Octagonal, Dodecagonal, Hexadecagonal, etc),Tubular, Tapered
Wall thickness : 3.5mm
Galvanization : Hot dip galvanization of substation structure is in accordance with Chinese standard GB/T 13912-2002 and American standard ASTM A123.
Products |
|
Application |
|
Standrad |
|
Painting |
|
Shape |
|
Galvanization |
|
Life Period |
|
A. Management team: We have a professional design team to provide services for customers. Provide design drawings.
B. ISO 9001:2008 certificate provided .
C. QC Inspection: We have an inspector team to inspect the whole production line, and each pole should be inspected in accordance with the drawing, to make sure all poles are passed before delivery.
Before galvanization, we will check the pole quality during the fabrication process from cutting raw plate, bending/forming, automatic welding to drilling holes. Then after hot dip galvanization, we will check the diameters, galvanization thickness and do the load test according to clients' different requirements and then deliver the poles on time according to the contract.
1. Price Term: EXW, FOB, CFR or CIF.
The price includes pole shaft, base plate, crossarm and anchor bolt.
Shipping seaport: Shanghai Seaport.
Please provide drawings if you have so that we can calculate the accurate price for you.
We also provide design according to your requests, if you don't have drawings.
2. MOQ: One 40FT Container.
3. Payment Term: Typically 30% by T/T as deposit, balance by T/T or L/C at sight before shipment. Other payment way can be negotiated.
4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.
5. Package: Normally wraped by plastical bags or burlap cloth at the top and bottom,or according to clients requirement.
Jiangsu Hongguang Steel Pole Co., Ltd.
Address: Wanshi Industrial Zone, Yixing City, Jiangsu Pro., P.R.China, 214212
Telphone: +86 510 878 441 56
Fax: +86 510 878 435 28
Trade manager ID: cnhgsteelpole
Skype: tangjia870124
Company youtube link: https://youtu.be/C9sHcnm3RKI
Please feel free to contact us!
![]() |
OEM Hot Dip Galvanised Steel Pole For Electrical Power Transformer Substation Images |